Skip to product information
1 of 6

Rooted In Christ Cross Christian - Men's Curved Basketball Shoes With Thick Soles

Rooted In Christ Cross Christian - Men's Curved Basketball Shoes With Thick Soles

Regular price $89.99 USD
Regular price Sale price $89.99 USD
Sale Sold out
Shipping calculated at checkout.
Shoe size
Quantity

Description

Step out in faith with these Rooted In Christ Cross Christian Sneakers, designed for believers who want their walk to reflect strength, purpose, and devotion. Featuring a bold red and white colorway, clean cross artwork, and a powerful root-inspired design, this pair carries a meaningful message of staying grounded in Christ through every season of life.

The white cross with branching roots represents a deep spiritual foundation, reminding you to stay rooted in faith, truth, and God’s love. The “Rooted In Christ” lettering adds a bold Christian statement, making these sneakers perfect for everyday wear, church gatherings, casual outfits, walking, travel, or faith-based events.

With its sporty high-top silhouette, lace-up design, and standout Christian artwork, this shoe is a great choice for Christian men, believers, fathers, husbands, and anyone who loves faith-inspired footwear with a clean and powerful look. This is not a custom shoe — it is a ready-to-wear Christian design made to inspire every step.


Complete with eyelets and a lace up closure for a classic look

  • The upper is made of PU and the sole is made of Rubber
  • Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
  • Season: Autumn, Spring, Summer, Winter
  • Occasion: Outdoor, Sports
  • Gender: Men
  • Care Instruction: Spot clean only
  • Custom area is the upper, for custom areas please refer to yoycol mockup generator for details 
  • This product is made on demand. No minimums
  • Multiple shipping options available, and cost varies on time efficiency.

Size Guide

 

EUR Size US Size Insole Length(inch) Insole Length(mm)
39 6 9.9 251
40 7 10.2 259
41 8 10.5 266
42 8.5 10.6 270
43 9.5 10.9 278
44 10 11.1 283
45 11 11.4 290
46 12 11.7 296
47 12.5 11.9 303
48 13 12.2 311
49 14 12.5 318
50 15 12.7 323

 

Product measurements may vary by up to 3~5mm

View full details