Skip to product information
1 of 6

Faith Mountain Cross - Men's Curved Basketball Shoes With Thick Soles

Faith Mountain Cross - Men's Curved Basketball Shoes With Thick Soles

Regular price $89.99 USD
Regular price Sale price $89.99 USD
Sale Sold out
Shipping calculated at checkout.
Shoe size
Quantity

Description

Walk with faith, strength, and purpose in these Faith Mountain Cross - Men's Curved Basketball Shoes With Thick Soles. Designed with an olive-green mountain landscape, bold cross artwork, forest silhouette, white dove detail, and GOD-inspired lettering, this pair brings a powerful faith-based message into a rugged everyday sneaker style.

The high-top design gives the shoes a strong, athletic look while the clean white sole and deep green tones make them easy to wear with jeans, joggers, casual outfits, and streetwear. Every detail is made to reflect courage, belief, and a life guided by faith.

A meaningful gift for Christian men, fathers, husbands, sons, pastors, church members, outdoor lovers, and anyone who wants to carry a message of faith with every step.


Complete with eyelets and a lace up closure for a classic look

  • The upper is made of PU and the sole is made of Rubber
  • Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
  • Season: Autumn, Spring, Summer, Winter
  • Occasion: Outdoor, Sports
  • Gender: Men
  • Care Instruction: Spot clean only
  • Custom area is the upper, for custom areas please refer to yoycol mockup generator for details 
  • This product is made on demand. No minimums
  • Multiple shipping options available, and cost varies on time efficiency.

Size Guide

 

EUR Size US Size Insole Length(inch) Insole Length(mm)
39 6 9.9 251
40 7 10.2 259
41 8 10.5 266
42 8.5 10.6 270
43 9.5 10.9 278
44 10 11.1 283
45 11 11.4 290
46 12 11.7 296
47 12.5 11.9 303
48 13 12.2 311
49 14 12.5 318
50 15 12.7 323

 

Product measurements may vary by up to 3~5mm

View full details